PHOTOS

Hebron Platform Illustration Hebron Project Illustration Bull Arm - Aerial Prior to Hebron Work Bull Arm - Construction of Bund Wall Bull Arm - Construction of Bund Wall (December 2012) Bull Arm  - Concrete Batch Plants Bull Arm - Dry Dock Pumped of Water Bull Arm Gravity Base Structure Construction - Bottom Layer of Base Slab Bull Arm - Dry Dock Gravity Base Structure Construction  (December 2012) Bull Arm - Dry Dock Gravity Base Structure Construction (May 2013) Bull Arm - Dry Dock Gravity Base Structure Construction (October 2013) Bull Arm - Dry Dock Gravity Base Structure Construction (November 2013)Bull Arm - Worker at Bull Arm Site Bull Arm - Inside Gravity Base Structure the Storage Cell (October 2013) Bull Arm - Dry Dock Gravity Base Structure Construction (December 2013) Bull Arm - Mechanical Outfitting Inside the Centre Shaft of the Gravity Base Structure Bull Arm - Living Quarters - Lifting Frame Beams  (August 2013)
Bull Arm Dry Dock Lookout Cow Head Fabrication Facility in Marystown Marystown - Drilling Support Module First Steel Cut Marystown: Lower Deck Korea - Aerial of Hyundai Heavy Industries (HHI) Fabrication Yard Korea - Aerial of Hyundai Heavy Industries (HHI) Fabrication Yard Korea - Drilling Equipment Set Fabrication Korea - Utilities processing Module Setting Started Gravity Based Structure Towed to Deepwater Construction Site Gravity Based Structure Towed to Deepwater Construction Site Topsides Living Quarters - Module Hall at Bull Arm Bull Arm - Aerial of Gravity Base Structure Flotilla Marystown - Drilling Support Module Marystown - Drilling Support Module on Barge Prior to Transport to Bull Arm, NLBull Arm - Aerial of Gravity Base Structure Flotilla Bull Arm - Aerial of Gravity Base Structure Flotilla Korea - Utilities Process ModuleBull Arm - Gravity Base Structure Flotilla Korea - Utilities Process Module Bull Arm - Rebar on Gravity Base StructureHebron Utilities Process Module (UPM) departing Ulsan, Korea on the heavy lift vessel, the Blue Marlin Bull Arm - Gravity Base Structure Flotilla Bull Arm - Drilling Support Module Arrival Completed Utilities Process Module Arrives At Bull Arm Hebron Topsides Tow to Deepwater Site Hebron Topsides Tow to Deepwater Site